Development services fees

All prices listed are effective 1 July 2025 to 30 June 2026.

Applications

ItemAll GST free

Building plan stamping

$27.10

Build Over Asset and/or Easements

$176.00

Development assessment

$385.00

Revision of development assessment

$394.00

Preliminary servicing advice

$624.00

Remote from services

$79.65

Water/sewer main extension/adjustments (includes relocation of sewer point of connection)

$398.00

Stormwater channel connection – assessment fee

$292.00

Design assessments

Complex works design review

ItemAll GST free

a) Water-point asset (water pump stations, pressure reduction valves)

$5,649.00

b) Sewer-point asset (wastewater pump stations, pressure sewer, odour control)

$6,499.00

c) Linear water and sewer asset (including pressure sewer)

(i) Tier 1 (0-99m)

$952.00

(ii) Tier 2 (>99-1000m)

$3,999.00

(iii) Tier 3 (>1000m)

$5,800.00

Servicing strategy review

ItemAll GST free

Servicing strategy review – per asset class

Note: Water, sewer and recycled water are individual asset groups and each attract an assessment fee. Additional iterations may attract additional fees charged at the technical services hourly rate ($184.80 per hour incl. GST)

$1,955.00

Environmental assessment

ItemAll GST free

Environmental assessment report review

$1,138.00

Inspections

Complex works inspection fees

ItemAll GST free

(a) Water-point asset (water pump stations, pressure reduction valves)

$9,353.00

(b) Sewer-point asset (wastewater pump stations, pressure sewer and odour control)

$8,522.00

(c) Linear water and sewer asset (including pressure sewer)

(i) Tier 1 (0-99m)

$1,061.00

(ii) Tier 2 (>99-1000m)

$1,433.00

(iii) Tier 3 (>1000m)

$1,946.00

Bond fees

ItemAll GST free

Bond application* (Applies to a single application)

Note: Additional assets can be included at the technical services hourly rate ($184.80 per hour incl. GST)

$2,751.00

Technical services

ItemIncluding GST

Technical services hourly rate

$184.80

Accredited suppliers

ItemAll GST free

Accredited supplier assessment fee

$968.00

Determining charges