If you are connecting to our water supply system you will need to provide the following information to us:
Hydraulic Assessment |
|
Water Meter Size |
|
Size of Water main Drilling |
|
Scheduled Date of Drilling |
|
Water Service Size
Required for service connection for greater than two units or commercial /industrial properties
|
|
Time |
|
Plumber |
|
Licence Number |
|
Contact Number |
|
If Hunter Water is undertaking the drilling,
the Scheduled Date
|
|
Time |
|
Meter Frame Ready Date |
|