Review of Environmental Factors - Boulder Bay WWTW
Worley Parsons has prepared a Review of Environmental Factors (REF) on behalf of Hunter Water to assess the potential environmental impacts of the proposed upgrade. Hunter Water is the proponent and determining authority pursuant to Part 5 of the Environmental Planning and Assessment Act 1979. The Concept Design has been developed concurrently with the REF, to ensure that environmental requirements have been considered and incorporated during the design phase.
The environmental assessment for the proposal is now available for comment and can be downloaded using the links below.
If you experience any difficulties with downloading this information, please contact Lindsay Begg on 02 4979 9513.
Main Environmental Assessment Document
REF Main Report (2.11MB)
Appendices A-D (3.69MB)
- Appendix A – Is an EIS Required?
- Appendix B – ESD Checklist
- Appendix C - Port Stephens – Great Lakes Marine Park Zoning Plan 2007
- Appendix D – Authority Consultation
Appendix E – Oceanographic Studies
Appendix F – Ecological Assessment (2.64MB)
Appendix H – Air Quality Assessment (1.32MB)
Appendix I – Noise Assessment (1.41MB)
The REF can also be viewed at Hunter Water’s Head Office, 36 Honeysuckle Drive Newcastle, between 9.00am and 4.30pm during the public exhibition period. Enquiries should be directed to Lindsay Begg on 02 4979 9513 or lindsay.begg@hunterwater.com.au.
Submissions should be delivered to the Hunter Water Corporation by close of business on Friday 24 October 2008. Submissions may be made electronically to lindsay.begg@hunterwater.com.au
Boulder Bay WWTW Upgrade
Hunter Water Corporation
36 Honeysuckle Drive
Newcastle
PO Box 5171
HRMC NSW 2310